PM Surya Ghar Muft Bijli Yojana 2026 Apply Online Subsidy Status is the updated practical guide for households considering rooftop solar under the national portal. This PM Surya Ghar Muft Bijli Yojana 2026 Apply Online Subsidy Status page explains the August 2026 progress update, who should apply, how subsidy and net metering work, the ≤10 kW feasibility rule, loan route, documents and complaint steps.
Live Updates
LIVE MONITORING
Latest status: Official scheme information was checked on 10.08.2026.
Last checked: 10.08.2026 at 12:00 IST.
PM Surya Ghar latest update August 2026
The 04.08.2026 MNRE update reported 50.06 lakh beneficiary households, 14.8 GW commissioned rooftop capacity, ₹28,024 crore released through DBT and nearly 19 lakh households reporting zero electricity bills. July 2026 added 5.06 lakh households. These are programme-level figures; they do not mean every applicant receives the same subsidy or zero bill.
| Update point | Reported position |
|---|---|
| Beneficiary households | 50.06 lakh |
| July 2026 addition | 5.06 lakh households |
| Commissioned rooftop capacity | 14.8 GW |
| Subsidy released through DBT | ₹28,024 crore |
| Households reporting zero bills | Nearly 19 lakh |
Who can apply for PM Surya Ghar subsidy
The residential rooftop-solar route is for an eligible electricity consumer with a valid residential connection. Apply through the National Portal, select the electricity distribution company and wait for the portal workflow before installation. Do not pay an unlisted “approval charge” to an agent.
| Practical check | What to confirm |
|---|---|
| Consumer | Residential electricity connection in the applicant or eligible household name |
| Roof | Technically suitable rooftop with safe access and shadow assessment |
| Vendor | Choose a vendor shown through the official portal workflow |
| Bank | Account and DBT details are accurate for subsidy processing |
| Metering | Distribution-company approval and net-metering steps are completed |
PM Surya Ghar subsidy, loan and ≤10 kW rule
The programme offers central financial assistance according to the approved capacity and current guidelines. The latest financing reference mentions collateral-free nationalised-bank loans at a concessional 5.75% rate for the present, subject to lender terms. Feasibility approval has been waived or deemed for systems up to 10 kW, but local DISCOM inspection, safety and net-metering requirements still matter.
| PM Surya Ghar subsidy loan | PM Surya official record |
|---|---|
| Loan reference | 5.75% concessional rate reference; lender approval and terms apply |
| Feasibility up to 10 kW | Waived or deemed under the reported update, subject to the remaining technical process |
| Net metering | DISCOM approval, meter installation and commissioning remain relevant |
| Subsidy | Released through DBT after the prescribed installation and verification workflow |
| Jan Samarth | Paperless loan integration is available as a financing facilitation reference |
How to apply on the PM Surya Ghar national portal
Use the official National Portal link in the final Important Links section. Keep the consumer number, mobile, bank and roof details ready. The actual subsidy timeline starts after the portal, vendor and DISCOM steps are completed, so do not treat registration as approval.
- Register with the electricity consumer number and mobile number.
- Select the DISCOM and submit the rooftop-solar application.
- Choose an eligible vendor through the portal route and confirm system details.
- Complete installation, inspection and net-metering or commissioning steps.
- Upload or confirm the required documents and bank details.
- Track subsidy status on the portal and save every acknowledgement.
| Document | Why it is needed |
|---|---|
| Electricity bill or consumer number | Identifies the connection and DISCOM |
| Aadhaar or identity record | Supports applicant verification where requested |
| Bank account details | Used for DBT subsidy processing |
| Installation and commissioning record | Supports completion and subsidy release |
| Net-meter or DISCOM documents | Evidence of the prescribed grid-connection process |
PM Surya Ghar practical mistakes to avoid
Do not select a vendor only because of a low quotation. Compare the approved system capacity, warranty, inverter and safety equipment. Do not assume a 10 kW feasibility waiver removes every DISCOM step. If the portal, vendor or subsidy status is stuck, record the application number and raise a complaint through the official grievance route.
| Problem | Practical action |
|---|---|
| Portal registration fails | Recheck consumer number, mobile and DISCOM selection |
| Vendor asks for an unofficial fee | Do not pay; retain the quote and report through the official route |
| Subsidy is pending | Check commissioning, bank DBT and DISCOM verification status |
| Net-metering delay | Contact the concerned DISCOM with the application number |
| Loan question | Use the official financing route; lender terms control sanction and repayment |
Important Links
| Resource | Direct link |
|---|---|
| PM Surya Ghar National Portal | Open official National Portal |
| MNRE rooftop solar portal | Open MNRE rooftop-solar portal |
| PM Surya Ghar official scheme background | Read official scheme approval |
| Concessional loan reference | Read official PIB loan reference |