PM Surya Ghar Muft Bijli Yojana 2026 Apply Online Subsidy Status is the updated practical guide for households considering rooftop solar under the national portal. This PM Surya Ghar Muft Bijli Yojana 2026 Apply Online Subsidy Status page explains the August 2026 progress update, who should apply, how subsidy and net metering work, the ≤10 kW feasibility rule, loan route, documents and complaint steps.

Live Updates

Advertisement

LIVE MONITORING

Latest status: Official scheme information was checked on 10.08.2026.

Last checked: 10.08.2026 at 12:00 IST.

PM Surya Ghar latest update August 2026

The 04.08.2026 MNRE update reported 50.06 lakh beneficiary households, 14.8 GW commissioned rooftop capacity, ₹28,024 crore released through DBT and nearly 19 lakh households reporting zero electricity bills. July 2026 added 5.06 lakh households. These are programme-level figures; they do not mean every applicant receives the same subsidy or zero bill.

Update pointReported position
Beneficiary households50.06 lakh
July 2026 addition5.06 lakh households
Commissioned rooftop capacity14.8 GW
Subsidy released through DBT₹28,024 crore
Households reporting zero billsNearly 19 lakh

Who can apply for PM Surya Ghar subsidy

The residential rooftop-solar route is for an eligible electricity consumer with a valid residential connection. Apply through the National Portal, select the electricity distribution company and wait for the portal workflow before installation. Do not pay an unlisted “approval charge” to an agent.

Practical checkWhat to confirm
ConsumerResidential electricity connection in the applicant or eligible household name
RoofTechnically suitable rooftop with safe access and shadow assessment
VendorChoose a vendor shown through the official portal workflow
BankAccount and DBT details are accurate for subsidy processing
MeteringDistribution-company approval and net-metering steps are completed
Advertisement

PM Surya Ghar subsidy, loan and ≤10 kW rule

The programme offers central financial assistance according to the approved capacity and current guidelines. The latest financing reference mentions collateral-free nationalised-bank loans at a concessional 5.75% rate for the present, subject to lender terms. Feasibility approval has been waived or deemed for systems up to 10 kW, but local DISCOM inspection, safety and net-metering requirements still matter.

PM Surya Ghar subsidy loanPM Surya official record
Loan reference5.75% concessional rate reference; lender approval and terms apply
Feasibility up to 10 kWWaived or deemed under the reported update, subject to the remaining technical process
Net meteringDISCOM approval, meter installation and commissioning remain relevant
SubsidyReleased through DBT after the prescribed installation and verification workflow
Jan SamarthPaperless loan integration is available as a financing facilitation reference

How to apply on the PM Surya Ghar national portal

Use the official National Portal link in the final Important Links section. Keep the consumer number, mobile, bank and roof details ready. The actual subsidy timeline starts after the portal, vendor and DISCOM steps are completed, so do not treat registration as approval.

  1. Register with the electricity consumer number and mobile number.
  2. Select the DISCOM and submit the rooftop-solar application.
  3. Choose an eligible vendor through the portal route and confirm system details.
  4. Complete installation, inspection and net-metering or commissioning steps.
  5. Upload or confirm the required documents and bank details.
  6. Track subsidy status on the portal and save every acknowledgement.
DocumentWhy it is needed
Electricity bill or consumer numberIdentifies the connection and DISCOM
Aadhaar or identity recordSupports applicant verification where requested
Bank account detailsUsed for DBT subsidy processing
Installation and commissioning recordSupports completion and subsidy release
Net-meter or DISCOM documentsEvidence of the prescribed grid-connection process

PM Surya Ghar practical mistakes to avoid

Do not select a vendor only because of a low quotation. Compare the approved system capacity, warranty, inverter and safety equipment. Do not assume a 10 kW feasibility waiver removes every DISCOM step. If the portal, vendor or subsidy status is stuck, record the application number and raise a complaint through the official grievance route.

ProblemPractical action
Portal registration failsRecheck consumer number, mobile and DISCOM selection
Vendor asks for an unofficial feeDo not pay; retain the quote and report through the official route
Subsidy is pendingCheck commissioning, bank DBT and DISCOM verification status
Net-metering delayContact the concerned DISCOM with the application number
Loan questionUse the official financing route; lender terms control sanction and repayment
ResourceDirect link
PM Surya Ghar National PortalOpen official National Portal
MNRE rooftop solar portalOpen MNRE rooftop-solar portal
PM Surya Ghar official scheme backgroundRead official scheme approval
Concessional loan referenceRead official PIB loan reference
Advertisement
Share this update
GD Sarkari Naukri Desk
Written By: GD Sarkari Naukri Desk

Tracks central and state government recruitment notifications, admit cards, results and cut-offs for Global Drishti, verified directly against official recruitment portals and notification PDFs. Trusted by students and job aspirants nationwide.

Join Free Sarkari Job Alerts on Telegram

Admit card, result, answer key and exam date alerts are posted with direct official links. No spam, only useful updates.

Best for: Admit card release, result PDF, rejection list, last date reminders.

Join Free Job Alerts Join WhatsApp Community

🛠️Tools